PROCESS PROJECTS: – (Completed Successfully-30+Projects)
Ethyl Acetate (Capacity-150 MTD)
Scope-3D Modeling, Piping Layout, Isometric Drawings & MTO, Stress Analysis, Structural Analysis, Structural Detailing, MTO, Ducting, Site Visit and Inspection, As Built Drawing Preparation, Project Engineer @ Site For-6 Months
Vegetable Oil Refinery
Scope-3D Modeling, Piping Layout, Isometric Drawings & MTO, Stress Analysis, Structural Analysis, Structural Detailing, Site Visit and Inspection, As Built Drawing Preparation
Process Plant
Scope 3D Modeling, Piping Layout, Isometric Drawings & MTO, Support Drawings, Support MTO, Stress Analysis, Structural Analysis, Structural Detailing, As Built Drawing Preparation
60KLPD Distillery Plant
Scope-3D Modeling, Piping Layout, Isometric Drawings & MTO, Stress Analysis, Structural Analysis, Structural Detailing, MTO, Ducting, Site Visit and Inspection, As Built Drawing Preparation, Project Engineer @ Site For-4 Months