EFFECTIVELY REDUCING HUMAN ERROR IN A POWER PLANT
Carelessness or negligence is not always the reason behind the Human error. In some cases, the desire for extra speed increased production & making task easier mean guards are bypassed or removed. Workers may become bored and distracted with repetitious work or use unsafe work practices to overcome poor plant design. For example, locating two important operator controls close together which are of similar shape or size may lead to the user mistakenly operating the wrong control.
EPC SECTOR IN INDIA CONTINIOUSLY GROWING
In India, the construction industry has evolved from item rate packages to lump sum contracts and then to EPC contracts over the years. It has resulted in a visible shift from owner-managed projects to projects where the risk of time and cost overruns has been transferred to the contractor, along with the responsibility of designing, procurement of material and construction. .